Ries Road (2025)

Project Overview

In 2025, the City of Ballwin will resurface Ries Road to address deteriorated pavement. Benefits include a smoother driving surface, upgraded and more cost efficient street lighting, and compliance with federal regulations. Approval of federal funding was received for the resurfacing of Ries Road, to which the City will receive reimbursement of 80% of the total construction cost. 

This is a resurfacing project and not a street reconstruction. Since this project was made possible by a grant, the City is bound to the project specifications submitted during the grant process, and is limited in its ability to work outside of the approved scope of the project. 

The project consists of:

• Resurfacing of the Existing Asphalt
• Pavement Striping
• Curb Ramp Replacement
• Curb and Gutter Replacements
• Concrete Driveway Approach Replacement
• Street Lighting Improvements

Project Plans

The 2025 Ries Road Resurfacing Project preliminary plans can be found here.

Schedule

Construction of this project is set to start on April 14th and is expected to be finished by December 31st, 2025. To see the letter that was sent out to residents by Raineri Construction, the firm hired to do the project, click here.